The I-15 South Design-Build*project stretches from Tropicana Avenue to just south of Silverado Ranch Boulevard. The project includes widening the freeway, the addition of collector-distributor roads,* five redesigned interchanges, 26 new bridge sections, 35 retaining walls, and sound walls.

  • Addition of Collector-Distributor roads* that will take merging traffic off of the mainline allowing smoother through-traffic
  • New bridges for Sunset Road and Warm Springs Road allowing traffic off to flow over I-15
  • Wider ramp lanes that will improve traffic capacity at the following interchanges:
  • Tropicana Avenue
  • Russell Road
  • I-215
  • Blue Diamond Road (new flyover) See Rendering
  • Silverado Ranch Boulevard (ramp widened to two lanes exiting, auxiliary lane added to reduce backup on the freeway)
  • 1.5 miles of sound barriers
  • Landscaping and aesthetic treatments on bridges, retaining walls and sound walls
  • Intelligent Transportation System – Technology to smooth your ride through the corridor

*Collector-Distributor (C/D) roads
Ramps that would normally integrate with freeway traffic are instead shifted outwards to the C/D road. The weaving associated with entering and exiting the freeway is no longer on the main lines. This allows for smoother traffic flow on the freeway.

*Design-Build
Design-Build is a construction project delivery method in which the design and the construction aspects are completed by a single contractor. This system minimizes the project risk and reduces the completion schedule by overlapping the design and construction phases of a project.

 

 Traffic Alerts
 
 Announcements
 Polls
 Diversity Program
* Click here for information about I-15 Design-Build South’s Disadvantaged Business Enterprise Program.
Name (required)
Company Name
Telephone (required)
Email (required)
Inquiry Details (required)